As part of the energy-efficient refurbishment of the Celle Badeland, the existing central heating system was expanded to include two combined heat and power units, which in turn are supported by two gas boilers when required. A buffer storage system was also installed to optimize the running times of the CHP units. By using a condensing heat exchanger, the waste heat in the exhaust gas from the CHP units can also be used, further maximizing the efficiency of the system.

Customer name

SWH Verwaltungs- und Betriebs-GmbH Hildesheim

Project name

Celler Badeland

Location

Celle

Measures

2 CHP UNITS 2 peak load boilers 2 buffer tanks with 57mÂł each

Success story

Perfect building performance right from the start! By using synavision right from the commissioning stage, it was possible to ensure that the systems achieved their planned energy efficiency at a very early stage!