Firmenzentrale Dr. Kurt Wolff GmbH & Co. KG2017-09-20T16:14:56+02:00

Project Description

Perennial Performance Check of the Building Management System in less than four weeks

  • digitaler prüfstand

On behalf of company Dr. Kurt Wolff GmbH & Co. KG, well-known by brands like Alpecin and Alcina, we have put the Building Management System of the Headquarter to the Digital Test Bench for Building Performance. Especially by means of the hydraulic scheme and the measured data we could make a fully digital analysis of measured data of a one year’s period in less than two weeks – with success:  So we could identify a lot of economic potential that our efficiency would have amortized already after approx. 19 months.

Project Headquarter of Dr. Kurt Wolff GmbH & Co. KG
Location Bielefeld
Successes
  • Identification of Optimization Potentials in two weeks (Net processing period)
  • Amortization in about 19 months only on Basis of identified economic potential
  • Prevention of pre-matured wear appearances at cooling devices and valves by regulating optimization
Building Equipment District heating, Compressor chillers, Cooling tower, Ventilation central devices, 4 heating circuits
Data points 45

„We control the operation of our Building Engineering Systems via our Building Management System. Although we have optimized the Systems continuously in cooperation with several specialists, we put them to the Digital Test Bench from synavision. And it paid off: synavision has identified exciting optimization potential, which can simply be exploited and save operating costs. Our expenditure was a minimum – synavision has made it without a single location visit.“

Dr. Andreas Kiefer, Plant Manager, Dr. Kurt Wolff GmbH & Co. KG

XINGLinkedInTwitterFacebook