References

Airport of Stuttgart

Skyloop auf dem Flughafen Stuttgart
Amortisationszeitraum: 7 months
Customer

Project

SkyLoop

Location

Stuttgart

Successes

Accelerated successfully the commissioning of the building technology through technical monitoring!

Building Equipment
  • 2 Cooling Towers
  • 2 Steam Accumulators
  • 6 Thermal/Cooler Exchanger
  • 2 Ventilation Central Devices
Data Points

140

Zitat

“The round-the-clock monitoring and analysis of the system operation requires a high level of specific know-how and costs us a lot of time, especially when taking over a new building. With the digital test bench, we were able to identify defects and optimization possibilities precisely, quickly and comprehensibly. That is truly valuable support for the commissioning process and technical management of the building. “

Timo Müller, Airport of Stuttgart